TheimpactofmodicationstoBIMenvironmenttoolsonreducingthetimerequiredfordevelopingdrawingdocumentation 127
References
Alreshidi, Eissa, Monjur Mourshed, and Yacine Rezgui. “Factors for Eec-
tive BIM Governance.” Journalof Building Engineering 10 (2017):
89–101. https://doi.org/10.1016/j.jobe.2017.02.006.
Azhar, Salman. “Building Information Modeling (BIM): Trends, Bene-
ts, Risks, and Challenges for the AEC Industry.” Leadership and
ManagementinEngineering 11, no. 3 (2011): 241–52. https://doi.org/
10.1061/(ASCE)LM.1943-5630.0000127.
Azhar, Salman, Malik Khalfan, and Tayyab Maqsood. “Building Infor-
mation Modeling (BIM): Now and Beyond.” AustralasianJournal
ofConstructionEconomics andBuilding12, no. 4 (2012): 15–28.
https://doi.org/10.5130/ajceb.v12i4.3032.
Barlish, Kristen, and Kenneth Sullivan. “How to Measure the Benets
of BIM – A Case Study Approach.” AutomationinConstruction 24,
(2012): 149–59. https://doi.org/10.1016/j.autcon.2012.02.008.
Blanco, Fernando G. Bañuelos, and Haibo Chen. “The Implementation
of Building Information Modelling in the United Kingdom by the
Transport Industry.” Procedia–SocialandBehavioralSciences 138
(2014): 510–20. https://doi.org/10.1016/j.sbspro.2014.07.232.
Borkowski, Andrzej Szymon. “A Literature Review of BIM Denitions:
Narrow and Broad Views.” Technologies 11, no. 6 (2023): 176. https://
doi.org/10.3390/technologies11060176.
Bui, Nam, Christoph Merschbrock, and Bjørn Erik Munkvold. “A review
of Building Information Modelling for Construction in Developing
Countries.” ProcediaEngineering 164, (2016): 487–94. https://doi.
org/10.1016/j.proeng.2016.11.649
Cha, HeeSung, and Jun Kim. “A study on 3D/BIM-based on-site per-
formance measurement system for building construction.” Journal
ofAsianArchitecture andBuilding Engineering 19, no. 6 (2020):
574–85. https://doi.org/10.1080/13467581.2020.1763364.
Charef, Rabia, Stephen Emmitt, Haz Alaka, and Farid Fouchal. “Build-
ing Information Modelling Adoption in the European Union:
An Overview.” JournalofBuildingEngineering 25 (2019): 100777.
https://doi.org/10.1016/j.jobe.2019.100777.
Edirisinghe, Ruwini, and Kerry London. “Comparative Analysis of Inter-
national and National Level BIM Standardization Eorts and BIM
Adoption.” Proceedingsofthe32ndCIBW78Conference, (2015):
149–58. https://itc.scix.net/paper/w78-2015-paper-015.
Grzyl, Beata, Wojciech Migda, and Magdalena Apollo . “Building Infor-
mation Modeling in Small and Middle Sized Buildings – case Study.”
IOPConferenceSeries:MaterialsScienceandEngineering 603, no. 3
(2019): 032077. https://doi.org/10.1088/1757899X/ 603/3/032077.
Ham, Nam-Hyuk, Jung-Hye Yang, and Ok Kyung Yuh. “A Study on the
Productivity Analysis of 3D BIM-based Fabrication Documents
Extraction.” Journalof KIBIM 9, no. 3 (2019): 30–40. https://doi.
org/10.13161/kibim.2019.9.3.030.
Herr, Christiane M., and Thomas Fischer. “BIM Adoption Across the
Chinese AEC Industries: An Extended BIM Adoption Model.”
JournalofComputationalDesignandEngineering 6, no. 2 (2019):
173–78. https://doi.org/10.1016/j.jcde.2018.06.001.
Hong, Ying, Ahmed W.A. Hammad, Ali Akbarnezhad, and Mehr-
dad Arashpour. “A Neural Network Approach to Predicting the
Net Costs Associated with BIM Adoption.” Automation in Con-
struction 119 (2020): 103306. https://doi.org/10.1016/j.autcon.
2020. 103306.
Kaner, Israel, Rafael Sacks, Wayne Kassian, and Tomas Quitt. “Case
Studies of BIM Adoption for Precast Concrete Design by Mid-Sized
Structural Engineering Firms.” JournalofInformationTechnology
inConstruction(ITcon) 13, no. 21 (2008): 303–23. https://www.it-
con.org/paper/2008/21.
Mitera-Kiełbasa, Ewelina, and Krzysztof Zima. “BIM Policy in Eastern
Europe.” Civil and Environmental EngineeringReports 33, no. 4
(2023): 14–22. https://doi.org/10.59440/ceer/177606.
Mitera-Kiełbasa, Ewelina, and Krzysztof Zima. “BIM Policy Trends in
Europe: Insights from a Multi-Stage Analysis.” AppliedSciences 14,
no. 11 (2024): 4363. https://doi.org/10.3390/app14114363.
NBS, Enterprises. 10
th
Annual BIMReport. Published: May 26, 2020.
Accessed: June 6, 2024, at https://www.thenbs.com/knowledge/na-
tional-bim-report-2020.
Othman Idris, Yasser Y. Al-Ashmori, Yani Rahmawati, Y.H. Mugahed
Amran, and Mohammed A.M. Al-Bared. “The Level of Building
Information Modelling (BIM) Implementation in Malaysia.” Ain
ShamsEngineering Journal 12, no. 1 (2021): 455–63. https://doi.
org/10.1016/j.asej.2020.04.007.
Sacks, Rafael, and Ronen Barak. “Impact of Three-dimensional Para-
metric Modeling of Buildings on Productivity in Structural Engi-
neering Practice.” Automation in Construction 17, no. 4 (2008):
439–49. https://doi.org/10.1016/j.autcon.2007.08.003.
Sarvari, Hadi, Daniel W.M. Chan, Mansooreh Rakhshanifar, Nerija Ba-
naitiene, and Audrius Banaitis. “Evaluating the Impact of Building
Information Modeling (BIM) on Mass House Building Projects.”
Buildings 10, no. 2 (2020): 35. https://doi.org/10.3390/build-
ings
10020035.
Singh, Vishal, and Jan Holmström. “Needs and Technology Adoption:
Observation from BIM Experience.” Engineering, Construction
and Architectural Management 22, no. 2 (2015): 128–50. https://
doi.org/10.1108/ECAM-09-2014-0124.
Yang Jyh-Bin, and Hung-Yu Chou. “Subjective Benet Evaluation
Model for Immature BIM-enabled stake-holders.” Automation in
Construction 106 (2019): 102908. https://doi.org/10.1016/j.autcon.
2019.102908.
Streszczenie
Wpływ modykacji narzędzi środowiska BIM
na skrócenie czasu opracowywania dokumentacji rysunkowej w projektowaniu architektonicznym
Tematem artykułu jest wpływ zmian w narzędziach wykorzystywanych w technologii BIM (Building Information Modeling) na efektywność opra-
cowania rysunków technicznych w projektach budynków mieszkalnych. Przedstawiono w nim wyniki badania analizującego, w jaki sposób mody-
kacje tych narzędzi wpływają na czas tworzenia dokumentacji architektonicznej. Autorzy skoncentrowali się na najczęściej używanych narzędziach
BIM wykorzystywanych do tego celu.
Technologia BIM znacząco przyspiesza proces tworzenia dokumentacji projektowej w branży budowlanej. Ze względu na swoją integralną struk-
turę, oprogramowanie BIM ma potencjał do dalszego doskonalenia narzędzi używanych do specycznych zadań projektowych. Aby zidentykować
korzyści wynikające z proponowanych usprawnień, opracowano trzy projekty budynków mieszkalnych złożone z podobnych części. Wirtualne modele
budynków i ich dokumentację wytworzono za pomocą skryptów komputerowych, które symulowały pracę w dwóch wersjach środowiska BIM: do-
myślnej i dostosowanej. Taka metoda pozwoliła na zredukowanie opóźnień i zapewnienie uzyskania obiektywnych wyników.
Czas realizacji dokumentacji rysunkowej dla domu jednorodzinnego w dostosowanym środowisku BIM był krótszy o 49,87%, dla budynku wielo-
rodzinnego o 36,54%, a dla zespołu zabudowy o 79,74%. Aby zestawić korzyści uzyskane z wprowadzonych zmian odnośnie do czasu poświęconego
na modykacje, projektanci biegli w obsłudze oprogramowania BIM zostali poproszeni o wykonanie modelu jednego z projektów, a ich czas pracy
został zmierzony. Te wyniki zostały następnie uśrednione i porównane z czasem uzyskanym przez komputer, dzięki czemu ustalono stosunek między
wydajnością pracy człowieka i komputera. Wyniki te uwzględniały również czas potrzebny na wprowadzenie zmian w środowisku BIM, co pozwoliło
na ocenę opłacalności ich wdrożenia. W badanych przypadkach dostosowanie środowiska BIM okazało się korzystne dla budynku o powierzchni